Mallacoota - Mudbrick Pavilion Upgrade

Share Mallacoota - Mudbrick Pavilion Upgrade on Facebook Share Mallacoota - Mudbrick Pavilion Upgrade on Twitter Share Mallacoota - Mudbrick Pavilion Upgrade on Linkedin Email Mallacoota - Mudbrick Pavilion Upgrade link

Project Overview

Mallacoota Mudbrick Pavilion is a valuable, volunteer built, heritage building that was originally constructed as a soccer pavilion. It has been used for many years as the local community hall and hub for performing arts. The building is used by many community organisations for meetings and events.

The project will see the upgrade the entire facility to meet growing demand through the refurbishment of the existing structure along with some small extensions.

The proposed outcomes of the Mallacoota Mudbrick Pavilion are:

  • Upgrade the kitchen and bring this facility up to commercial grade with hygiene stations for hand washing and cleaning
  • An all-abilities toilet to be installed within the pavilion.
  • External toilets to be refurbished
  • Upgrade/extension of storage facilities
  • Rebuild of stage to provide additional depth and upgrade of stage access to improve safety and amenity.
  • Construction of separate studio/workshop, including dedicated wash up facilities.

Budget/Funding

This project is funded through the Australian Government Black Summer Bushfire Recovery Grants Program.



To receive important project updates, please subscribe.

Project Overview

Mallacoota Mudbrick Pavilion is a valuable, volunteer built, heritage building that was originally constructed as a soccer pavilion. It has been used for many years as the local community hall and hub for performing arts. The building is used by many community organisations for meetings and events.

The project will see the upgrade the entire facility to meet growing demand through the refurbishment of the existing structure along with some small extensions.

The proposed outcomes of the Mallacoota Mudbrick Pavilion are:

  • Upgrade the kitchen and bring this facility up to commercial grade with hygiene stations for hand washing and cleaning
  • An all-abilities toilet to be installed within the pavilion.
  • External toilets to be refurbished
  • Upgrade/extension of storage facilities
  • Rebuild of stage to provide additional depth and upgrade of stage access to improve safety and amenity.
  • Construction of separate studio/workshop, including dedicated wash up facilities.

Budget/Funding

This project is funded through the Australian Government Black Summer Bushfire Recovery Grants Program.



To receive important project updates, please subscribe.

  • Project Update - 13 February 2024

    Share Project Update - 13 February 2024 on Facebook Share Project Update - 13 February 2024 on Twitter Share Project Update - 13 February 2024 on Linkedin Email Project Update - 13 February 2024 link

    The Stage-1 upgrades to the kitchen are now complete.

    Works to upgrade the toilets and the workshop store have commenced.

    Kitchen installation, late 2023
  • Project Update - 18 August 2023

    Share Project Update - 18 August 2023 on Facebook Share Project Update - 18 August 2023 on Twitter Share Project Update - 18 August 2023 on Linkedin Email Project Update - 18 August 2023 link

    Upgrades to the Mallacoota Mudbrick Pavilion have commenced.

    The kitchen is undergoing a transformation, with new equipment and cabinetry being installed and designed in a way to retain the original character of the building. Much of the building upgrade works are being completed by Council teams to meet budget requirements and project deadlines.

    Any required closures will be limited to minimise interruption to the operation schedule of the pavilion and will be advised in advance.

    You need to be signed in to add your comment.

  • Project Update 6/04/2023

    Share Project Update 6/04/2023 on Facebook Share Project Update 6/04/2023 on Twitter Share Project Update 6/04/2023 on Linkedin Email Project Update 6/04/2023 link

    Design drawings were received last week.

    We are currently waiting for the engineering design for the removal of structural elements.

    Due to delays with design documents the project is likely to begin in the 2023/24 financial year.

  • Project Update 28/02/2023

    Share Project Update 28/02/2023 on Facebook Share Project Update 28/02/2023 on Twitter Share Project Update 28/02/2023 on Linkedin Email Project Update 28/02/2023 link

    The detailed design of the kitchen is complete.

    Construction is planned to commence in mid 2023 under the supervision of the EGSC building crew.