Bairnsdale - Lucknow Gymnastics Centre

Share Bairnsdale - Lucknow Gymnastics Centre on Facebook Share Bairnsdale - Lucknow Gymnastics Centre on Twitter Share Bairnsdale - Lucknow Gymnastics Centre on Linkedin Email Bairnsdale - Lucknow Gymnastics Centre link

Council secured funding through Sport and Recreation Victoria to contribute to the development of a new Gymnastics facility in Lucknow, Bairnsdale.

The East Gippsland Gymnastics Centre is based at the Lucknow Recreation Reserve, complementing and sitting beside the existing squash and table tennis centre.

Site construction activities commenced on 9 May 2022 and are now complete.

Funding for this project was provided by Council, State Government and the East Gippsland Gymnastics Club.




The East Gippsland Gymnastics Club is community based and offers classes from pre-kindergarten to mature-age adults.

This new home for the Club features two Olympic-sized inground trampolines and an open-ended trampoline that flows into a six-square-metre landing bag.

A "ninja zone" includes a scaffolding rig and other challenging obstacles.

A mezzanine viewing area with associated seating and heating complement the facility.

Since relocating to the new facility, the Club has experienced an increase in participation and membership, especially now trampolining and a fit-for-purpose ninja program are on offer.

Council would like to congratulate the East Gippsland Gymnastics Club and thank our contractors Eastern Victoria Construction Group Pty Ltd (EVCG).



Should you wish to search for other projects in your town, simply type the town name in the search bar.



Council secured funding through Sport and Recreation Victoria to contribute to the development of a new Gymnastics facility in Lucknow, Bairnsdale.

The East Gippsland Gymnastics Centre is based at the Lucknow Recreation Reserve, complementing and sitting beside the existing squash and table tennis centre.

Site construction activities commenced on 9 May 2022 and are now complete.

Funding for this project was provided by Council, State Government and the East Gippsland Gymnastics Club.




The East Gippsland Gymnastics Club is community based and offers classes from pre-kindergarten to mature-age adults.

This new home for the Club features two Olympic-sized inground trampolines and an open-ended trampoline that flows into a six-square-metre landing bag.

A "ninja zone" includes a scaffolding rig and other challenging obstacles.

A mezzanine viewing area with associated seating and heating complement the facility.

Since relocating to the new facility, the Club has experienced an increase in participation and membership, especially now trampolining and a fit-for-purpose ninja program are on offer.

Council would like to congratulate the East Gippsland Gymnastics Club and thank our contractors Eastern Victoria Construction Group Pty Ltd (EVCG).



Should you wish to search for other projects in your town, simply type the town name in the search bar.



  • Project Update - Car park nearing completion

    Share Project Update - Car park nearing completion on Facebook Share Project Update - Car park nearing completion on Twitter Share Project Update - Car park nearing completion on Linkedin Email Project Update - Car park nearing completion link

    The East Gippsland Gymnastics Centre car park is nearing completion.

    Line marking has been completed and now clearly defines road access and parking spaces. New light poles have been purchased, and installation scheduled to commence as soon as they are available on site.


  • 1 November 2023 - carpark installation

    Share 1 November 2023 - carpark installation on Facebook Share 1 November 2023 - carpark installation on Twitter Share 1 November 2023 - carpark installation on Linkedin Email 1 November 2023 - carpark installation link

    Lucknow Recreation Reserve Access Road and off-road parking

    Works on the new access road and off-road parking beside the new Gymnastics Pavilion are progressing well.

    • The new retaining wall is complete.
    • Footpath works have commenced.
    • Subsoil drainage works are complete.
    • Lighting works are underway.
    • Pavement works are complete.
    • Sealing/asphalting of pavement will be completed after footpath works have been completed.
    loader image
    Didn't receive confirmation?
    Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
    Submitting your comment
    Cancel
  • 9 September 2023 - OFFICIAL OPENING

    Share 9 September 2023 - OFFICIAL OPENING on Facebook Share 9 September 2023 - OFFICIAL OPENING on Twitter Share 9 September 2023 - OFFICIAL OPENING on Linkedin Email 9 September 2023 - OFFICIAL OPENING link

    Official Opening

    We had a great time opening the East Gippsland Gymnastics Centre.
    Thank you to everyone who came and to all the gymnasts for putting on a great show.
    This $2.53 million project was funded by $800,000 from Sport and Recreation Victoria, $1.63 million from Council and $100,000 from East Gippsland Gymastics Club. Our contractors Eastern Victoria Construction Group Pty Ltd EVCG also came along to see the end result of their work.


  • Project Update 1 June 2023

    Share Project Update 1 June 2023 on Facebook Share Project Update 1 June 2023 on Twitter Share Project Update 1 June 2023 on Linkedin Email Project Update 1 June 2023 link

    Trampoline and airbags are now installed. Final handover to club will occur when council receive the ‘as built’ drawings.

    Recreation Reserve user groups and neighbours have been advised that the roadworks around the new gymnasium will commence soon.

  • Project Update 19/04/2023

    Share Project Update 19/04/2023 on Facebook Share Project Update 19/04/2023 on Twitter Share Project Update 19/04/2023 on Linkedin Email Project Update 19/04/2023 link
    supporting image

    The new Lucknow Gymnastics Pavilion is complete and looks fabulous!!

    The final building inspection will be conducted for the certificate of occupancy next week.

    The building can soon be handed over to the East Gippsland Gymnastics Club.

  • Project Update 14/02/2023

    Share Project Update 14/02/2023 on Facebook Share Project Update 14/02/2023 on Twitter Share Project Update 14/02/2023 on Linkedin Email Project Update 14/02/2023 link

    The last internal concrete pour was completed today.

  • Project Update 9/02/2023

    Share Project Update 9/02/2023 on Facebook Share Project Update 9/02/2023 on Twitter Share Project Update 9/02/2023 on Linkedin Email Project Update 9/02/2023 link
    supporting image

    Construction of the new gymnasium is going well. West end concrete was poured on 9/2/2023, with the last pour to the middle section to be completed next week.

    • Tiling - to the showers and toilets is nearly complete
    • Internal painting - complete this week with touch ups to be done late next week.
    • The stairs to the mezzanine have been installed.
  • Project Update 23/11/2022

    Share Project Update 23/11/2022 on Facebook Share Project Update 23/11/2022 on Twitter Share Project Update 23/11/2022 on Linkedin Email Project Update 23/11/2022 link

    The new Lucknow Gymnastics Pavilion is progressing well. The roof is now fully covered with purlin rubber and riveting will soon be completed.

    • The sunken pit for the trampolines is well underway.
    • Concrete was poured for the floor to the east 1/3 of the building.
    • Timber framing and flooring has been delivered for the toilet, office, and mezzanine areas. Framing will begin on the office and toilet areas on Monday.
    • Windows and front entry slider are installed.
    • Concrete to the front path and services area will be set up Thursday 24 November, with a pour early next week.
  • Project Update 10/11/2022

    Share Project Update 10/11/2022 on Facebook Share Project Update 10/11/2022 on Twitter Share Project Update 10/11/2022 on Linkedin Email Project Update 10/11/2022 link

    Construction of a new purpose-built gymnastics facility at the Lucknow Recreation Reserve is progressing well.

    The roof is on and work on the trampoline pits and sewer drainage has commenced.

Page last updated: 07 Mar 2024, 07:30 PM