Omeo - Streetscape Revitalisation

Share Omeo - Streetscape Revitalisation on Facebook Share Omeo - Streetscape Revitalisation on Twitter Share Omeo - Streetscape Revitalisation on Linkedin Email Omeo - Streetscape Revitalisation link

The streetscape of Omeo town centre lacks any discernible sense of place with a mix match of various components and aging infrastructure, lack of street tree planting and urban amenity. The project will deliver increased small-scale infrastructure elements that will increase community usage and activity of the shopping commercial strip whilst providing added amenity to accommodate the increased tourism to the town being generated by the Omeo MTB Destination project. The streetscape will enable new infrastructure which will enhance the functionality of the main street and improving public spaces to bring more people to local businesses, and encouraging visitors and travelers to ‘stop, stay and spend’.

Design Scope

The concept aims to identify a number of modest and affordable interventions which will enhance the amenity and visual character of central Omeo. The concept is limited to Day Avenue and focusses on the footpath space. It does not deal with structural elements of the road such as carriageway width, broad kerb alignments or drainage.

The concept recognises that Omeo sits within a landscape that is dominated by the natural topography of the High Country, and so views are kept open to the surrounding hills and the Tambo River valley. It also recognises that the town has a long history and that elements of that history can still be seen – and so views to old buildings, particularly in the central Justice precinct, are also kept open. Finally, the concept recognises that Omeo is a living town that residents and visitors walk around and meet in, and where community events occur.

In response, the concept includes enhancement of the central town area focused on the civic park and RSL garden through new tree planting, additional seating, improved access to open space and simple treatment of the existing footpath pavement.

  • Provision of new feature planting areas, primarily at street corners, with trees and low-level planting, low stone edge walls and seating;
  • Provision of additional pram crossing to facilitate the crossing of Day Avenue for those with limited mobility;
  • Removal of the narrow nature strip along the primary school frontage, and replacement with new pavement and street trees to provide improved amenity and access for parents and students;
  • Replacement of old and damaged footpath pavement, particularly east of Short Street, and replacement with new pavement;
  • Installation of evergreen trees to provide “greening” during winter when the majority of existing trees are leaf-less;
  • Investigation into the provision of low-level planting and trees in the large open car park west of Tongio Street / Creek Street to provide improved visual amenity and prominence, while maintain vehicle movements and views;
  • Retention of all kerbside parking;
  • Upgrade of the public toilet / picnic area at the corner of Day Avenue and Tongio Street, with improved landscape and seating opportunities.

Community Consultation

A successful onsite community consultation session was held in Omeo to gather community feedback on this project. Concept Plan Community feedback is attached under Documents for your information. The feedback was presented to the Project Reference Group and elements have been incorporated within final concept plan (attached Documents).



Funding for this project has been provided by Living Local Regional Fund and further support from Council.

The streetscape of Omeo town centre lacks any discernible sense of place with a mix match of various components and aging infrastructure, lack of street tree planting and urban amenity. The project will deliver increased small-scale infrastructure elements that will increase community usage and activity of the shopping commercial strip whilst providing added amenity to accommodate the increased tourism to the town being generated by the Omeo MTB Destination project. The streetscape will enable new infrastructure which will enhance the functionality of the main street and improving public spaces to bring more people to local businesses, and encouraging visitors and travelers to ‘stop, stay and spend’.

Design Scope

The concept aims to identify a number of modest and affordable interventions which will enhance the amenity and visual character of central Omeo. The concept is limited to Day Avenue and focusses on the footpath space. It does not deal with structural elements of the road such as carriageway width, broad kerb alignments or drainage.

The concept recognises that Omeo sits within a landscape that is dominated by the natural topography of the High Country, and so views are kept open to the surrounding hills and the Tambo River valley. It also recognises that the town has a long history and that elements of that history can still be seen – and so views to old buildings, particularly in the central Justice precinct, are also kept open. Finally, the concept recognises that Omeo is a living town that residents and visitors walk around and meet in, and where community events occur.

In response, the concept includes enhancement of the central town area focused on the civic park and RSL garden through new tree planting, additional seating, improved access to open space and simple treatment of the existing footpath pavement.

  • Provision of new feature planting areas, primarily at street corners, with trees and low-level planting, low stone edge walls and seating;
  • Provision of additional pram crossing to facilitate the crossing of Day Avenue for those with limited mobility;
  • Removal of the narrow nature strip along the primary school frontage, and replacement with new pavement and street trees to provide improved amenity and access for parents and students;
  • Replacement of old and damaged footpath pavement, particularly east of Short Street, and replacement with new pavement;
  • Installation of evergreen trees to provide “greening” during winter when the majority of existing trees are leaf-less;
  • Investigation into the provision of low-level planting and trees in the large open car park west of Tongio Street / Creek Street to provide improved visual amenity and prominence, while maintain vehicle movements and views;
  • Retention of all kerbside parking;
  • Upgrade of the public toilet / picnic area at the corner of Day Avenue and Tongio Street, with improved landscape and seating opportunities.

Community Consultation

A successful onsite community consultation session was held in Omeo to gather community feedback on this project. Concept Plan Community feedback is attached under Documents for your information. The feedback was presented to the Project Reference Group and elements have been incorporated within final concept plan (attached Documents).



Funding for this project has been provided by Living Local Regional Fund and further support from Council.

  • 16 September 2024

    Share 16 September 2024 on Facebook Share 16 September 2024 on Twitter Share 16 September 2024 on Linkedin Email 16 September 2024 link

    Further updates will be provided on YourSay following the Council Election on 26 October 2024, and the questions/feedback tab will be reinstated.

    From 12.00 noon Tuesday 17 September until 6.00 pm on Saturday 26 October (Election Day) we will be in the Local Government Election Period (also known as Caretaker Period).

    During this time, we will limit our printed communications, website content, social media activity, and community consultations. The ability for people to comment on our social media content will also be disabled during the Election Period.

    Each of these steps is to ensure our content does not affect voting in the election and is consistent with steps taken by other Victorian Councils and the Local Government Act 2020.

    These changes are only temporary; we'll be back to normal communication activity after the election.

  • 05 August 2024

    Share 05 August 2024 on Facebook Share 05 August 2024 on Twitter Share 05 August 2024 on Linkedin Email 05 August 2024 link

    We have completed the road safety audit and are now updating the parking layout to accommodate a new pedestrian crossing strategically located in the centre of town to improve safety for the community and visitors to the area.

    Geotechnical investigations on the stability of the ground have been completed and are being used to inform the final design. We are also assessing the existing bus stop locations and consulting with experts to finalise the design details.


    We welcome your continued interest in this project. Please choose to follow this project on YourSay to receive important information regarding this project directly to your inbox.

  • Project Update 3/04/2023

    Share Project Update 3/04/2023 on Facebook Share Project Update 3/04/2023 on Twitter Share Project Update 3/04/2023 on Linkedin Email Project Update 3/04/2023 link

    Project Reference Group meeting - 5 April 2023.

Page last updated: 20 Nov 2024, 09:07 AM