12 September 2024
The design consultant has developed a preliminary design for a proposed bridge and road safety upgrade around the creek.
We have arranged for a consultant to undertake ecological assessment of the impacted area; flora and fauna species have been carefully identified and mapped.
The design will now progress through iterations to avoid and minimise impact on native vegetation whilst achieving a suitable level of flood resilience.
Share 12 September 2024 on Facebook
Share 12 September 2024 on Twitter
Share 12 September 2024 on Linkedin
Email 12 September 2024 link