9 September 2024
- The asphalt surface of the netball/tennis courts has been removed and the old change rooms now demolished.
- Our contractor has been able to cut the existing base material to the new subbase height.
- Electrical conduits and pits and storm water components have been delivered.
Excavation work will continue during the week, and we will also commence work on the new retaining walls.
The photos below show the new excavated areas above and beside the old courts.
Share 9 September 2024 on Facebook
Share 9 September 2024 on Twitter
Share 9 September 2024 on Linkedin
Email 9 September 2024 link