Lake King Beach Plan presented for information

A draft concept design for Lake King beach was released for public discussion in February 2018 as part of the Metung Village Centre Master Plan development, building on the work already undertaken in Patterson Park. This concept plan has been further reviewed with several changes made based on feedback received and available budget. Most notable changes from the concept plan are that the existing toilet block will remain (and will be refurbished), and the plantings will be reduced to maintain more open space. It is noted that there was strong feedback to improve the beach itself, beach nourishment will be investigated, however, this is not included in this particular project. The Plan is now presented for information, any critical feedback comments are required by Thursday 31 January 2019. Works at Lake King Beach are planned to commence from April 2019 (after Easter).


Share on Facebook Share on Twitter Share on Linkedin Email this link

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>