Stage 1 of EV charging: Omeo, Orbost, Cann River & Bairnsdale
June 2025
Stage 2 of EV charging: Mallacoota, Buchan and Lakes Entrance
The Buchan EV charger was ready in November 2024, and the Mallacoota EV charger was installed on 23 January 2025. The Lakes Entrance EV chargers should be installed in May 2025.